RoadMap
Juic3’s development is structured around three core phases: infrastructure, intelligence, and hardware. Each stage is designed to build on the last—unlocking compounding value across the grid, market, and protocol layers.
🏗️ 2025–2027: Ecosystem Infrastructure
“Connect batteries. scale resilience.”
Deploy live battery sites across Asia (China, Singapore, Japan, Taiwan, etc.)
Integrate sites into local grid markets for DR / frequency response
Establish legal and regulatory connections to each national grid operator
Launch and iterate on the Juic3 compliance & rewards protocol
Begin onboarding individuals and enterprises via Aggregator-as-a-Service
Objective: Lay the physical and legal foundation to activate distributed battery resources and unlock real-world grid rewards.
🧠2025–2030: Software & Smart Dispatch
“Coordinate flexible capacity taylored to local power demand.”
Develop predictive load-balancing and auto-bidding algorithms
Collaborate with local DSOs and utilities on tailored dispatch schemes
Optimize battery coordination via Juic3 protocol rulesets
Objective: Make Juic3 smart. Build local energy intelligence and automation layers to enable real-time, high-trust grid participation.
🔧 2027–2030: Hardware & Custom Energy Devices
“Design batteries for the people and the places they live in.”
Develop battery and inverter form factors tailored to household, EV, HVAC, and commercial segments
Standardize hardware–protocol integration for “plug-to-grid” readiness
Enable device staking and ownership onchain
Objective: Build hardware that speaks Juic3. Deliver inclusive, cost-effective energy devices ready for grid participation—by default.
Last updated